The U.S. Army Corps of Engineers (USACE) continues channel maintenance dredging in Southwest Pass and on the Crossings Above New Orleans (Fiscal Year 2022).  The USACE previously completed Phase 1 and Phase 2 of the historic project to deepen the Mississippi River Ship Channel Deepening (MRSC) to 50 Feet. The areas of the Ship Channel that required dredging to provide the deeper draft channel were mechanically deepened up to Smoke Bend at Mile 175 Above Head of Passes (AHP).

DUSTPAN DREDGES WORKING ON THE CROSSINGS ABOVE NEW ORLEANS:

HURLEY: The dustpan dredge HURLEY continues dredging on assignment at Red Eye Crossing (Mile 224 AHP) and is working to maintain or restore half channel width on the central 250 feet (full channel width is 500 feet).  The HURLEY commenced dredging on the Crossings on May 28, 2022.

WALLACE McGEORGE: The dustpan dredge WALLACE McGEORGE continues dredging operations at Rich Bend (Mile 158 AHP).  The dustpan’s next assignment is upriver at Alhambra Crossing (Mile 192 AHP). The assignment at Alhambra Crossing is now expected to start on the morning of Thursday, June 2, 2022. The WALLACE McGEORGE commenced dredging on the Crossings on May 10, 2022.

The NOBRA and Federal Pilots cleared the White Castle Anchorage (Mile 191.1 AHP to Mile 190.4 AHP) of vessels yesterday (Monday, May 30, 2022) and will keep the anchorage off limits until dredging operations at Alhambra are completed (estimate three weeks). The closure of the White Castle Anchorage is utilized to promote navigational safety for the dustpan dredges and vessels transiting this reach of the Ship Channel

JADWIN: The dustpan dredge JADWIN continues dredging full channel dimensions at Belmont Crossing (Mile 154 AHP).  The JADWIN commenced dredging on the Crossings on May 26, 2022.

HOPPER DREDGE(S) WORKING IN SOUTHWEST PASS (SWP):

GLENN EDWARDS: The industry hopper dredge GLENN EDWARDS (Manson Construction) is dredging on assignment from Mile 5.3 Below Head of Passes (BHP) to Mile 9.4 BHP. The GLENN EDWARDS is working under Southwest Pass Hopper Dredge Rental Contract #2-2021 estimated completion early September (2022).

CUTTERHEAD DREDGE(S) WORKING IN SOUTHWEST PASS (SWP): 

ROBERT M. WHITE: The cutterhead dredge ROBERT M. WHITE (Manson Construction) is beneficially using the dredged material on assignment from Mile 12.2 BHP to Mile 16.0 BHP on eastern side of the Ship Channel. The ROBERT M. WHITE is expected to complete this assignment today and then depart SWP to conduct some scheduled repairs in dry dock, the cutterhead is expected to return to SWP in August (2022) to complete the remaining hours under Southwest Pass Cutterhead Dredge Rental Contract #2-2020.

MAXIMUM DRAFT RECOMMENDATIONS PER PILOT ASSOCIATION: 

Based on the channel deepening project and the continued efforts to provide surveys over pipelines in two key areas of the Ship Channel (Venice Corridor Mile 12 AHP to Mile 11 AHP and at Mile 158.2 AHP) the documentation of the present maximum draft recommendation for each Pilot Association are listed below:

Associated Branch Pilots of the Port of New Orleans (Bar Pilots): The Bar Pilots increased their maximum freshwater draft to 50 feet freshwater at 1200 hours on March 16, 2022 specific to their route.

Crescent River Port Pilots Association (CRPPA): The CPPRA raised their maximum draft recommendation to 49 feet (freshwater) on Friday, February 11, 2022.  The CRPPA continue to monitor channel conditions and the latest surveys to consider adjustments to the maximum draft recommendation for their route

New Orleans Baton Rouge Steamship Pilots (NOBRA): The NOBRA raised their maximum draft to 48 feet (freshwater) from Mile 90.5 AHP to Mile 175 AHP on February 12, 2022.  The maximum draft recommendation from Mile 175 to 180 remains 47 feet and from Mile 180 to Mile 233.8 it remains 45 feet.

Associated Federal Pilots and Docking Masters of Louisiana (Federal Pilots): The Federal Pilots increased their maximum draft recommendation on March 5, 2022 to the following:

49 feet from Sea Buoy to Mile 104.7 AHP;

48 feet from Mile 104.7 AHP to 175 AHP;

45 feet Mile 175 AHP to 232.4 AHP; and

40 feet Mile 232.4 AHP to 233.8 AHP.

The controlling maximum freshwater draft for the MRSC up to the Port of New Orleans is 49 feet, the maximum draft decreases to 48 feet from the Port of New Orleans to Mile 175.0 AHP (Smoke Bend) until additional adjustments are made.

MISSISSIPPI RIVER STAGE UPDATES:

The Carrollton Gage (New Orleans) reading at 0400 hours today was 10.91 feet with a 24-hour change of – 0.17 feet.  The National Oceanic and Atmospheric Administration’s (NOAA) National Weather Service Extended Streamflow Prediction (28-Day) for the Carrollton Gauge issued today forecasts stages will continue a slow fall down to 8.9 feet on June 28 (2022). The highest crest on the Carrollton Gage in 2022 to date was 13.82 feet at 2100 hours on March 22, 2022.

The Baton Rouge Gage reading at 0400 hours was 30.30 feet with a 24-hour change of – 0.37 feet. The National Oceanic and Atmospheric Administration’s (NOAA) National Weather Service Extended Streamflow Prediction (28-Day) for the Baton Rouge Gauge issued today forecasts stages will continue a slow fall to 25.1 feet on June 28 (2022).