06
Mar
IMTT Geismar:
- River Stage ≥ 26’.0 – All ships and barges will require additional
mooring lines at the dock. This may be implemented sooner if there
are safety concerns at risk. - River Stage ≥ 26’.0 – All ships will require (1) standby tug at the dock.
This may be implemented sooner if there are safety concerns at risk. - River Stage ≥ 27’.5 – All barges at Load Spot 1, 2 and 3 will require a
standby tug at the dock. This may be implemented sooner if there are
safety concerns at risk. - River Stage ≥ 31’.0 – All ships will require (2) standby tugs at the dock.
This may be implemented sooner if there are safety concerns at risk.