MSIB XX-118

Due to USACE Revetment operations at Poydras (LDB, Mile 84.8, AHOP), vessel transits will be restricted as follows:
Daily from 6:00 AM – 7:00 PM local from October 27, 2020 to November 04, 2020.
Effective at 6:00 AM on October 27, 2020 or when the Mat Sinking Unit begins work at Poydras –
• All vessels are restricted to one-way traffic from MM 83.8 to MM 85.8 AHP LMR during the revetment operations listed above.
• All vessels shall transit at slowest safe speed to minimize wake and proceed with caution.
• All vessels shall contact the USACE on-scene pilots stationed on the M/V HARRISON or M/V WILLIAM JAMES via VHF-FM Channels 67 or 82 to make passing arrangements.